Equipment began to arrive for construction on May 28th. Early equipment used included a Caterpillar D6 bulldozer, earth mover, and a sheep foot compactor.
The CAFS site at the end of May 2010. Much of the site was overgrown in weeds and needed to have soil moved to create an even rough grade. Pictured here are Joe Sarten (UT Project Engineer), Dr. Charlie Goan (Acting Station Director), Danny Ferguson (Construction Team Member), and David Johnson (Construction Team Member) discussing the work to be done.